Final requirements for Sargent Breakwater project -

Image
Great details on the project on the Request for Proposal page for the Sargent Breakwater Project   - some interesting things on the construction of the breakwater and jetty at Mitchell's cut. Bids were due on October 25th so they are all in and being analyzed now.  The breakwaters are 400 feet long and spaced 660 feet apart in 4 feet depth of water. The angled terminal groin at the inlet extends to a water depth of 8 feet.  The goal of the project is to reduce beach erosion along Sargent Beach and the Matagorda Peninsula by stabilizing Sargent Beach and protecting the adjacent GIWW from erosional breaching.  The approximate cost range for construction of the Project is $28,000,000 to $35,000,000.  They will be staging at Mitchell's cut and using the road out to the cut to get equipment and supplies there The jetty will be just shy of 1/2 mile long going from the cut into the Gulf The staging areas will be secured - since one of the staging areas is the end of Mitchell cut - don