Update on Saving Sargent Beach

 1.  They came out to survey the beach and the surf for the beach nourishment project last week.  So that is good news. 

2.  Jetty and breakwater project - movement is slow - but is still movement - while it is frustrating it is going to happen - latest update:

Several moving parts here.  Not as simple as building a road.

We are meeting with project partners this week to update project element timing.


New news is that we will partner with USACE Federal Navigation Section and utilize the material from the Mouth of Colorado River as our sand source. 

A true federal BUDM component for the project. (Beneficial Use of Dredged Material)

Very pleased that the Corps, Port of Bay City have now become partners with us for this effort.

Great news.

3.  Opening the San Bernard - someone heard they were having trouble finishing the project and that it stopped.  They have not stopped but they are having trouble since they have to operate from the ocean side and the wind and waves are problematic - from the last update on the San Bernard site - they are so close -


No map of progress furnished this week...so near yet so far, an empty Gulf waits.
 
Status Report 11Mar22
Rigid Constructors - Dredging Contractor
Daniel Garza Project Manager - HDR Engineering, Inc, Owner’s-Engineer
 
NOTE: no change of the metrics since previous March 2nd report 
Based on daily reports, the following metrics have been calculated
LF (Linear Feet) = 8,280 (85.4% of 9,700) 
CY (Cubic Yards) = 366,855 (95.6% of 383,650)
 
There was no dredging over the past week. Due to high waves and strong tides, Rigid has not dredged since Wed March 2, 2022. Rigid provided an update to me yesterday indicating that this Saturday could possibly be the start of the next window to begin dredging.